Recalls of medical devices, diagnostic equipment, implants, and surgical instruments.
Showing 41–60 of 299 recalls
Boston Scientific Neuromodulation Corporation
Spinal cord stimulation system lead body may be exposed to stress at the anchor site. This may result in high impedance measurements or lead fractures, which may lead to inadequate stimulation, additional intervention, including lead explant and replacement.
Abiomed, Inc.
A potential for introducer sheath leakage from under the sheath cap and along the hub score lines, identified in 14Fr and 23Fr Introducers. These manufacturing issues are not visually detectable by the user, and 14Fr or 23Fr Introducers are provided in every pump set.